The manager of this school at Port Coquitlam reached out to True Level Concrete due to some trip hazards on their walkway. There was a general concern about teachers, students, and administrative workers getting hurt when walking to the school.
Some of the problems detected were:
THE PROCESS
True Level installers arrived on-site, reviewed the area with the school representative, and prepared the area where they’ll do the work. The installation started with drilling holes in the concrete slab for the injection ports.
PolyLevel foam was injected under the school walkway’s slabs, filling the voids and allowing a steady and controlled lift to bring the concrete back to its original position. After the walkway was lifted, the installers used Nexus Pro to seal the cracks on their walkway and control joints to prevent future settlement.
The process step by step was:
The school representative was relieved that the school walkway was lifted back into and that there wasn’t an uneven concrete anymore that could be a potential trip hazard to everyone in the educational center.
Do you have tripping hazards on your walkway? Contact us today!
PROJECT SUMMARY
Date: June 2022.
Time: 1 day to complete the job.
Certified PolyLevel Installer: True Level Concrete.
Products Installed: 95 lbs of PolyLevel material and 8.5 ft of Nexus Pro.